Keep up-to-date with prefab developments - sign up for the fabprefab newsletter

News of prefab happenings.

Prefab dwellings available now.

Prefab projects in development.

Arch. School prefab projects
For shipping container enthusiasts.

Other non-modernist projects.

Books, articles, links.

The fabprefab discussion boards.

modular, modernist... say what?

 
 

MD280 on show at CABoom 2004

Back to MD280 status page

The following images show Edgar Blazona's MD280 under construction and during transportation to CABoom A festival of contemporary design August 12-15 2004 in Santa Monica, CA


Bathroom module.


Front of living room.


Living room looking into bedroom with electrical plug boxes in place.


Loading up the truck (note the camber of the road - chock those modules!)


Bathroom at 30ft.


375 miles later...arriving in Santa Monica.
Bedroom on the left, bathroom on the right. Living room is already off the truck.


The bathroom is the last module being craned into place.
Living and bedroom modules are already bolted together.

Back to MD280 status page

© Copyright Sandor Pty Ltd
2003,2004.