The
first production Glidehouse was constructed in April 2004 at a Britco
Group plant in Agassiz, BC, Canada, which is one hours drive east
of Vancouver and three hours northeast of Seattle. Project Management
was provided by CRG (Construction
Resource Group).
Below we provide a photo overview of the construction process.
The
Britco Plant in Agassiz, BC.
Thank
you to Roger Starkweather at Construction Resource Group for providing
these images.
Module 1 floor
frame.
Plumbing in
floor.
Module 1 floor
upside down.
Floor being
screwed.
Floor in jig.
Floors sheathed.
Module 3 floor
frame.
Module 3 floor
sheathed.
Exterior wall
framing.
Exterior long
wall framed.
Module 2 exterior
wall up.
Module
2 exterior wall frame.
Bath.
Master bed
boarded.
Master bed
interior.
Module 2 exterior
view.
Module 3 framed.
Module 2 during
framing.
Module 3.
Module 2 interior.
Kitchen boarded.
Module 1 corridor.
Master bath
shower.
Mechanical
wall wiring.
Connecting
wires to panels.
Master Bath
Plumbing.
Getting it
right.
Spraying insulation.
Insulated wall.
Insulated wall.
Windows unwrapped.
Master bed
interior.
Sheath and
windows.
Mechanical
at back of closet.
Washer dryer
closet.
Bed 2 Door
installed.
Mud and tape.
Master bed
taped.
Bath 2 taped.
Master
bath taped at vanity.
Window at master
bath.
Exterior wall
papered.
Another view
of papered exterior wall.
Another view
of papered exterior wall.
Siding started.
Siding goes
up.
Installing
roof membrane.
Steel Siding
arrives.
Installing
the first sheet of steel siding.
Hardiplank
siding installed.
Siding laid
out (the houses shown are unrelated to Glidehouse).